What do I do first?
Choose one path. Both use the same materials and methods, so nothing you learn on the smaller build is wasted.
A. Build the console first
One afternoon · 40 pocket holes · one store run
It teaches every skill the table and benches need, on the smallest and least expensive piece.
Open the console guide → Full projectB. Build the whole set
Six sessions · 220 pocket holes
Shop and drill once, then build the console, benches, and table in a planned sequence.
Open the whole-set guide →If this is your first furniture build, pick A. The console gives you a complete, useful win before you take on the 96" table.
What you need before you start
Put these within reach before the first board comes out. You will not need a large workshop.
- Kreg 520PRO jig, stepped drill bit, long driver bit, stop collar, and hex key
- Power drill
- Clamps — at least two
- Tape measure
- Speed square
- Pencil
- Safety glasses
- Dust mask
- Damp rag for glue squeeze-out
- Blanket to protect the top during assembly
How this site works
You do not need to keep every instruction in your head. Open the page for the job in front of you.
Six terms before you begin
- Box leg
- Two vertical 2×4s capped top & bottom with short horizontals, forming a closed rectangle. No raw end-grain shows and it's rigid in both directions.
- Apron
- A board on edge running under a tabletop between the legs. It's the invisible backbone of nearly every real table.
- On edge
- The board standing on its skinny side (like a floor joist), which is its stiff orientation.
- Pocket hole
- An angled hole drilled by your Kreg 520Pro jig; a self-tapping screw through it clamps two boards together, hidden from view.
- Cap
- The short horizontal boards that close the top and bottom of a box leg. The “top cap” is the one that touches the tabletop; the “bottom cap” sits on the floor.
- Dry-fit
- Assembling a joint with clamps only, no glue, to check the fit before committing.
The order of operations
The guides use these same seven phase names, in this order. Finish one phase before moving to the next.
- ShopChoose straight boards and bring home the exact supplies.
- CutHave every part cut and group matching lengths together.
- DrillMark the hidden faces, set the jig once, and drill the pocket holes.
- LegsBuild the box legs flat and check that their diagonals match.
- AssembleLay each top face-down on the blanket and build onto it.
- FinishSand, seal and paint the bases, then clear-coat the pine tops.
- PlaceLet the finish cure, add pads, and move each piece with the right help.